Ahmadian Fard Fini, A, Rashidi, T H, Akbarnezhad, A and Travis Waller, S (2016) Incorporating Multiskilling and Learning in the Optimization of Crew Composition. Journal of Construction Engineering and Management, 142(05).

Hammad, A W A, Akbarnezhad, A, Rey, D and Waller, S T (2016) A Computational Method for Estimating Travel Frequencies in Site Layout Planning. Journal of Construction Engineering and Management, 142(05).

Ilbeigi, M, Ashuri, B and Shayegh, S (2016) Price Adjustment Clauses and Submitted Bid Prices for Major Asphalt Line Items in Highway Projects. Journal of Construction Engineering and Management, 142(05).

Ioannou, P G and Yang, I (2016) Repetitive Scheduling Method: Requirements, Modeling, and Implementation. Journal of Construction Engineering and Management, 142(05).

Lopez, R, Chong, H, Wang, X and Graham, J (2016) Technical Review: Analysis and Appraisal of Four-Dimensional Building Information Modeling Usability in Construction and Engineering Projects. Journal of Construction Engineering and Management, 142(05).

Lucko, G, Araújo, L G and Cates, G R (2016) Slip Chart–Inspired Project Schedule Diagramming: Origins, Buffers, and Extension to Linear Schedules. Journal of Construction Engineering and Management, 142(05).

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001089
  • Abstract:
    Linear schedules continue to hold significant potential for planning and control in construction project management, where work progress of activities is often repetitive in nature. However, linear schedules are limited in graphical comparisons. A slip chart from the aerospace industry, which recorded launch dates on two axes of time, is rediscovered as inspiration for an improved tool. However, whereas its original form could only track points in time, schedule activities must be represented as ranges across time. Therefore, additional theory is needed to extend slip charts toward being able to handle linear schedules. To create such a layout, this research systematically extends its conventions and capabilities. A conversion algorithm for linear schedules is derived. New features are introduced for a comprehensive approach. In particular, buffers that represent minimum and also maximum constraints between activities are investigated and converted. Criticality and float are defined.

Prego, F J, Solla, M, Núñez-Nieto, X and Arias, P (2016) Assessing the Applicability of Ground-Penetrating Radar to Quality Control in Tunneling Construction. Journal of Construction Engineering and Management, 142(05).

Saleem, M, Al-Kutti, W A, Al-Akhras, N M and Haider, H (2016) Nondestructive Testing Procedure to Evaluate the Load-Carrying Capacity of Concrete Anchors. Journal of Construction Engineering and Management, 142(05).

Salehipour, A, Naeni, L M, Khanbabaei, R and Javaheri, A (2016) Lessons Learned from Applying the Individuals Control Charts to Monitoring Autocorrelated Project Performance Data. Journal of Construction Engineering and Management, 142(05).

Sierra, L A, Pellicer, E and Yepes, V (2016) Social Sustainability in the Lifecycle of Chilean Public Infrastructure. Journal of Construction Engineering and Management, 142(05).

Zhang, L, Wu, X and Liu, H (2016) Strategies to Reduce Ground Settlement from Shallow Tunnel Excavation: A Case Study in China. Journal of Construction Engineering and Management, 142(05).